1 00:00:10,870 --> 00:00:08,549 nasa's first step back to the moon will 2 00:00:12,629 --> 00:00:10,880 become a reality with the liftoff of the 3 00:00:14,789 --> 00:00:12,639 lunar reconnaissance orbiter 4 00:00:17,510 --> 00:00:14,799 and its companion the lunar crater 5 00:00:20,070 --> 00:00:17,520 observation and sensing satellite 6 00:00:22,070 --> 00:00:20,080 lro and lcross will launch aboard a 7 00:00:23,910 --> 00:00:22,080 united launch alliance atlas v 8 00:00:25,910 --> 00:00:23,920 rocket from cape canaveral air force 9 00:00:27,910 --> 00:00:25,920 station in florida 10 00:00:29,189 --> 00:00:27,920 built by nasa's goddard space flight 11 00:00:31,750 --> 00:00:29,199 center in maryland 12 00:00:33,510 --> 00:00:31,760 lro arrived at the payload processing 13 00:00:35,830 --> 00:00:33,520 facility of astrotech space 14 00:00:38,150 --> 00:00:35,840 operations in titusville florida on 15 00:00:40,790 --> 00:00:38,160 february 13th 16 00:00:41,510 --> 00:00:40,800 following on lro's heels elk cross 17 00:00:43,430 --> 00:00:41,520 arrived at 18 00:00:45,990 --> 00:00:43,440 astrotech from northrop grumman's 19 00:00:48,150 --> 00:00:46,000 facility in redondo beach california on 20 00:00:51,189 --> 00:00:48,160 february 19th 21 00:00:54,069 --> 00:00:51,199 on february 20th the atlas v centaur 22 00:00:55,750 --> 00:00:54,079 second stage arrived in florida followed 23 00:00:58,549 --> 00:00:55,760 by the first stage on march 24 00:01:00,150 --> 00:00:58,559 3rd both were delivered by a russian 25 00:01:03,750 --> 00:01:00,160 cargo plane that landed at cape 26 00:01:06,149 --> 00:01:03,760 canaveral air force station skid strip 27 00:01:08,070 --> 00:01:06,159 in march lro underwent black light 28 00:01:10,390 --> 00:01:08,080 inspections to detect any possible 29 00:01:13,350 --> 00:01:10,400 particulate micro contamination 30 00:01:14,070 --> 00:01:13,360 my new cracks or fluid leaks and by 31 00:01:17,350 --> 00:01:14,080 april 32 00:01:19,350 --> 00:01:17,360 lro had its solar arrays installed 33 00:01:21,670 --> 00:01:19,360 in the meantime the systems and science 34 00:01:24,630 --> 00:01:21,680 instruments of lcross were prepared and 35 00:01:26,870 --> 00:01:24,640 tested for the rigors of this mission 36 00:01:28,230 --> 00:01:26,880 in late april the rocket's first stage 37 00:01:29,910 --> 00:01:28,240 or booster stage 38 00:01:31,990 --> 00:01:29,920 was transported to the vertical 39 00:01:35,510 --> 00:01:32,000 integration facility at launch complex 40 00:01:37,749 --> 00:01:35,520 41 on cape canaveral air force station 41 00:01:38,870 --> 00:01:37,759 the centaur second stage also known as 42 00:01:40,789 --> 00:01:38,880 the upper stage 43 00:01:43,670 --> 00:01:40,799 was later moved out of the hangar and 44 00:01:47,030 --> 00:01:43,680 hoisted atop the booster stage 45 00:01:49,030 --> 00:01:47,040 by may 15 the atlas v centaur stack was 46 00:01:51,749 --> 00:01:49,040 ready to be moved to the launch pad for 47 00:01:53,670 --> 00:01:51,759 a wet dress rehearsal or countdown test 48 00:01:54,870 --> 00:01:53,680 this means the vehicle was fully loaded 49 00:01:58,149 --> 00:01:54,880 with liquid hydrogen 50 00:02:02,230 --> 00:01:58,159 liquid oxygen and rp-1 propellants and 51 00:02:04,469 --> 00:02:02,240 tested on may 28th the spacecraft was 52 00:02:07,670 --> 00:02:04,479 transported to launch complex 41 53 00:02:10,150 --> 00:02:07,680 for mating with the atlas v rocket with 54 00:02:12,790 --> 00:02:10,160 these pre-launch milestones complete 55 00:02:13,990 --> 00:02:12,800 lro and l cross are now ready to journey 56 00:02:16,630 --> 00:02:14,000 to the moon 57 00:02:18,390 --> 00:02:16,640 lro to find safe landing sites and 58 00:02:20,790 --> 00:02:18,400 available resources 59 00:02:22,229 --> 00:02:20,800 and lcross to plunge into one of the 60 00:02:24,790 --> 00:02:22,239 polar caps to expose 61 00:02:26,869 --> 00:02:24,800 possible evidence of water ice the 62 00:02:28,229 --> 00:02:26,879 tucson will help pave the way for humans